12/26 – I’d say that I have about 80% of the wood cut, and ready to build. Early morning and long day tomorrow for the shed to go into place. It’s right at a 50-55 mile trip each way – so I need to get as much done on day one as possible. That’s why I’ve made sure to pre-cut wood, and will have my trusty helper, Amber, with me, since my other scheduled helper is out of town visiting family for the holidays.
Leave a Reply
You must be logged in to post a comment.